WELCOME TO OUR BLOG

We're sharing knowledge in the areas which fascinate us the most
click
March 4th, 2026

AIMF480-B24: The Ultimate 480W Explosion-Proof DIN-Rail Power Supply for Industrial Control Systems

The AIMF480-B24 is a robust 480W explosion-proof DIN-Rail power supply designed for industrial control and automation systems. With a wide input voltage range and high efficiency (up to 95%), this power supply is perfect for hazardous locations and demanding environments. ATEX and IECEx certified, it provides reliable power and enhanced safety, making it the ideal choice for engineers and procurement leads in industries requiring explosion-proof solutions.
March 2nd, 2026

TPS010–100W GP Series DIN Rail Power Supply: Spec-Driven Selection for US Panels, Procurement, and Fast RFQs

Looking for a reliable and compact DIN rail power supply? The TPS010-100W GP Series offers a convection-cooled, IP20 solution with a wide AC/DC input range, ideal for building and industrial automation panels, as well as LED lighting control cabinets. This BoFu guide will help US system integrators, panel builders, and engineers easily select the right model for their needs and get an RFQ quickly.
February 19th, 2026

What automotive customers ask for under IATF 16949: practical supplier deliverables

A deliverables-focused guide for automotive supplier expectations: what evidence customers request under IATF 16949 (PPAP-ready approval pack, control plan proof, traceability, calibration/measurement confidence, change control, supplier flow-down, and containment/corrective action), with a copy/paste checklist for POs and SOWs.
February 18th, 2026

ISO 13485 for electronics contract manufacturing: the documentation medical customers expect

A practical guide to ISO 13485 documentation and traceability for electronics contract manufacturing: what customers expect in build records, document control, traceability depth, supplier control evidence, and a checklist you can use to qualify a CM.
February 17th, 2026

ESD standards in practice: building an ESD program (and making carts compliant)

ANSI/ESD S20.20 vs IEC 61340-5-1 explained: what an ESD control program must cover (administrative + technical), how audits work, and how ESD carts fit into EPA and transport controls—plus a copy/paste checklist.
February 16th, 2026

NEC 409 SCCR marking: how to label panels so they pass inspection

A practical guide to NEC 409 SCCR marking for industrial control panels: what must be on the label, how to justify the rating (listed vs UL 508A SB), what inspectors ask for under NEC 409.22, and a copy/paste checklist to avoid rework.
February 26th, 2026

What inspectors look for under NEC: the documentation and markings that prevent delays

A practical NEC inspection readiness guide for industrial control cabinets: what documents inspectors ask for, which labels and markings commonly fail, and a repeatable checklist to avoid rework and schedule slips.
February 12th, 2026

Medical EMC (IEC 60601-1-2): building a practical pre-test plan for ME systems

A practical IEC 60601-1-2 pre-test plan for medical racks/carts: define intended-use environment, essential performance and pass/fail criteria, lock configuration + cabling, build a test matrix, run repeatable pre-tests, and package evidence for the lab.
Go to page
Get in Touch with TPS
Name*
Business Email*
Company Name
Country/Region
Inquiry Type*
Application / Industry
What problem are you facing right now?
What are you trying to achieve?
Target Timeline
Budget Range
We use Cookie to improve your online experience. By continuing browsing this website, we assume you agree our use of Cookie.