PRODUCT INTRODUCTION · PROGRAMMABLE DC LOADS
Selecting an electronic load is a purchasing decision about test coverage, repeatability, and integration cost. A suitable instrument must absorb the required voltage, current, and power throughout the test, communicate with the controller, and fit the rack’s thermal budget. The EA-EL 9000 B Series addresses these requirements with programmable DC sinking in a 19-inch, 3U enclosure.
TPS ELECTRIC LLC supports global B2B customers with this product category, model selection, equivalent solutions, and project integration consultation. This guide focuses on two practical configurations: the 80 V, 510 A EL 9080-510 B and the 500 V, 90 A EL 9500-90 B. Both require careful power-envelope review; their voltage and current maxima are not simultaneously available.
Start with the EA-EL 9000 B Series product range and prepare your source limits, loading profile, and installation conditions for a TPS technical review.
Application Fit and Purchasing Priorities
A programmable electronic DC load replaces fixed resistors with a controlled current sink. Engineers can change loading conditions without rebuilding the fixture, while procurement can specify one repeatable platform for development, production verification, or service testing.
This series is a conventional, dissipative load: absorbed DC energy becomes heat. It does not return that energy to the AC supply. For extended high-power operation, compare cooling costs and operating hours with a regenerative DC load approach before fixing the architecture.
- Electrical engineers: verify operating points, regulation behavior, measurement error, and transient response.
- System integrators and panel builders: confirm communications, protective devices, rack space, and heat removal.
- Business owners, product managers, and procurement: compare delivered scope, acceptance criteria, commissioning effort, and operating cost.
For lower-power bench work, the desktop electronic load selection guide provides another starting point. TPS can review either category against your actual test plan.
For supplier comparison, define a representative acceptance test before requesting prices. Include the source connection, loading sequence, expected measurements, and required report format. This gives purchasing teams a comparable scope and helps product managers distinguish instrument capability from fixture design or software work. Where several production stations must behave consistently, include configuration control and repeat setup requirements in the project brief.
Model Selection: Voltage, Current, and Power Limits
The family includes maximum-voltage classes of 80, 200, 360, 500, and 750 V, maximum-current ratings from 20 to 510 A, and model-dependent peak power from 1.2 to 7.2 kW. These are alternative model ratings, not one universal operating range. Select voltage capability first, then verify current and sustainable dissipation at every operating point.
| Selection parameter | EL 9080-510 B | EL 9500-90 B |
|---|---|---|
| Maximum input voltage | 80 V | 500 V |
| Maximum input current | 510 A | 90 A |
| Peak input power | 7,200 W | 3,600 W |
| Steady input power at 21°C | 4,500 W | 3,600 W |
| Approximate minimum voltage for full rated current | 2.2 V | 6.5 V |
| Total dimensions, W × H × D | 483 × 133 × 568 mm | 483 × 133 × 568 mm |
| Approximate weight | 17 kg | 17 kg |
| TPS configuration page | Review the 80 V / 510 A option | Review the 500 V / 90 A option |
Continuous operation: steady ratings above apply at 21°C ambient. Available power decreases as the load heats and ambient temperature rises. A peak rating is not a guaranteed continuous rating or a guaranteed pulse duration. Submit pulse width, repetition, starting temperature, and recovery time for review.
Check Real Operating Points Before Ordering
A 48 V source delivering 80 A produces 3,840 W. That point is below the EL 9080-510 B’s 4,500 W steady rating at 21°C, but still needs thermal validation at the rack’s actual inlet temperature. At 48 V and 150 A, power reaches 7,200 W: the peak limit, not a continuous operating point. Use the EL 9080-510 B configuration as a high-current candidate, rather than assuming 510 A is available at 80 V.
For a 400 V source at 8 A, the required dissipation is 3,200 W. The EL 9500-90 B configuration accommodates that point within its stated 21°C steady rating. At 400 V and 10 A, however, 4,000 W exceeds its 3,600 W limit. Higher voltage capability does not remove the power constraint.
Low-voltage performance also deserves a separate check. Full rated current requires approximately 2.2 V on the 80 V model or 6.5 V on the 500 V model, measured at the load input. If a battery discharge test approaches these levels, cable drop can reduce available current before the desired cutoff is reached. Provide the complete voltage-versus-current trajectory, including the final discharge point.
Test Modes and Application Workflows
Four regulation modes support different source behaviors: constant current (CC), constant voltage (CV), constant power (CP), and constant resistance (CR). Choose the mode according to the device under test, then define independent limits and stop conditions.
- Power supplies and DC/DC converters: use CC for load regulation checks and programmed current changes for transient evaluation. Specify rise time, fixture inductance, and measurement bandwidth.
- Batteries and chargers: use controlled discharge profiles with voltage cutoff and battery-test counters for time, amp-hours, and watt-hours. Confirm chemistry-specific limits separately.
- Photovoltaic sources: use MPP tracking to investigate a connected source’s power point. A sinking load does not itself generate a simulated solar-source output.
The built-in function generator supports periodic, ramp, arbitrary, and table-based profiles. A listed DIN 40839 waveform function describes an available stimulus shape; it does not certify an automotive compliance test. TPS can help translate your acceptance procedure into a practical loading sequence and identify where external measurement equipment is needed.
Automation and Parallel Expansion
A 4.3-inch touchscreen and rotary controls support local operation. Rear USB-B and a galvanically isolated analog interface support remote control; analog operation uses selectable 0–5 V or 0–10 V scaling. The front USB-A port serves supported local functions and is not the rear USB communication connection.
Optional digital modules include Ethernet, CAN, CANopen, Profibus, Profinet, RS232, ModBus TCP, and EtherCAT. Specify the exact module and protocol in the RFQ. Do not assume Ethernet or an industrial fieldbus is included in the base instrument. Digital integration supports SCPI and ModBus RTU as documented for the applicable interface.
Master-slave operation permits up to 16 units of the same model, using the master-slave and Share connections according to the manual. Size the group from the required continuous dissipation at ambient temperature. Series connection of load inputs is not permitted.
For a separate programmable source, review the rack DC power supply integration guide. Pairing a source and load requires coordinated control and protection; it does not automatically create a qualified bidirectional system.
Define what the automation must prove: command completion, settled operating state, alarm response, and traceable measurement records. A communications link alone does not establish synchronized transient capture. For fast events, specify an oscilloscope or other appropriate acquisition system and agree on trigger conditions. TPS can review the division of responsibilities between instrument functions, supervisory software, and external measurement before the integration scope is priced.
Rack Installation and Electrical Integration
Allow for the 568 mm total device depth, rear connections, cable bending space, and at least 300 mm of rear ventilation clearance. Use suitable support rails for the approximately 17 kg featured models. Provide strain relief for heavy DC cables rather than allowing their weight to load the terminals.
Operation is specified for dry indoor environments, 0–50°C ambient, up to 2,000 m altitude, and noncondensing humidity up to 80%. The temperature range does not imply full power across that range. Avoid hot exhaust recirculation and assess cabinet cooling with the intended duty cycle.
The auxiliary AC supply accepts 90–264 V AC at 45–65 Hz. For both featured configurations, maximum auxiliary consumption is 130 W. That value does not represent absorbed DC test power: the facility must still remove several kilowatts of heat. Review AC inrush and branch protection during installation planning.
For batteries or other sources without current limiting, provide an appropriately engineered external DC disconnect or fuse. The manual states that reverse-polarity protection is absent and the DC input is not internally fused. Confirm polarity, protective earth, touch protection, and grounding before energizing.
Remote sensing compensates voltage drop up to 5% of nominal voltage. It does not correct undersized cables or remove cable heating. TPS can review the load, cable assemblies, cabinet arrangement, and custom integration requirements as one project scope, with feasibility and deliverables confirmed in the quotation.
As an illustrative wiring check, an 80 A test through a 10 milliohm total cable-loop resistance loses 0.8 V and generates 64 W in the wiring. The source and load therefore see different voltages. Include conductor temperature, terminal resistance, and connection length when reviewing low-voltage tests; confirm final cable sizing and protective-device coordination for the actual installation rather than copying a generic conductor recommendation.
Standards and Acceptance Evidence
The supplied manual lists EN 61010-1, EN 55011 Class A Group 1, and EN 61326-1. Treat these as documented standards references, rather than proof of every approval your destination or completed test rack requires. Request model-specific declarations and supporting documentation; any required US listing must be confirmed separately.
Define measurement acceptance limits early. At 23 ±5°C, stated voltage regulation accuracy is ≤0.1% of rated maximum voltage and current regulation accuracy is ≤0.2% of rated maximum current. These are full-scale-based specifications, not percentages of the reading; displayed-value error is additional as specified in the manual.
Ask TPS to confirm calibration evidence, documentation language, supplied accessories, firmware applicability, and support arrangements. Agree on a representative loaded acceptance run, alarm behavior, and recorded results before shipment or commissioning.
Request a Configured Test Solution from TPS
TPS supports global B2B projects with relevant DC load products, equivalent solution evaluation, selection assistance, and engineering consultation. For custom fixtures, cable assemblies, or cabinet integration, describe the desired scope so TPS can confirm feasibility and responsibilities.
Send maximum and minimum DUT voltage, required current, continuous watts, pulse profile, test duration, ambient temperature, interface, and pass/fail requirements. Add quantity, ship-to country and postal code, target delivery date, and required compliance or calibration documents.
Request a quotation that identifies the exact model, interface module, accessories, integration work, acceptance scope, commercial terms, and confirmed lead time. Stock, pricing, warranty terms, and delivery commitments require quotation-level confirmation.
Ready for a technical and commercial review? Use the series inquiry page to describe your test envelope, or start with the 80 V high-current model or 500 V model. Ask TPS to verify continuous power at your ambient temperature and quote the complete configuration.
Frequently Asked Questions
Can the EL 9080-510 B absorb 7.2 kW continuously?
No. Its 7.2 kW rating is peak input power; stated steady power is 4.5 kW at 21°C. Thermal conditions determine peak availability and sustainable operation.
Which featured model fits a 400 V source?
The 500 V EL 9500-90 B is the voltage-compatible candidate. Verify actual current and power; 400 V at 8 A requires 3.2 kW, while 10 A exceeds its 3.6 kW rating.
Does this series recover energy to the grid?
No. It dissipates absorbed energy as heat. If recovery is a project requirement, ask TPS to compare a regenerative load solution against your duty cycle and facility constraints.
Is Ethernet included as standard?
Ethernet is an optional digital module in the supplied manual. Confirm the ordered interface; rear USB-B and isolated analog control are standard provisions.
Can TPS quote a complete rack-level solution?
TPS can review product selection and proposed integration or customization. Submit the test plan, rack conditions, controls, quantity, and destination through the TPS product inquiry route to confirm scope and availability.