A high-power test rack needs more than a 30 kW nameplate. Buyers must match the DC operating envelope, facility supply, automation architecture, and installation scope before comparing quotations. The EA-PUB 10000 4U Series is a programmable bidirectional DC power unit for projects that need both sourcing and regenerative sinking, particularly remotely controlled or expandable rack systems.
TPS ELECTRIC LLC offers this product category alongside selection support and integrated power solutions for global B2B customers. Start with the EA-PUB 10000 4U product specifications and quotation request and share the operating points your system must achieve.
Purchase decision: Shortlist this series when you need bidirectional DC power, energy recovery, and remote system control. Confirm 208 V input derating, model-specific current limits, master compatibility, and optional functions before placing an order.
Platform Fit and Key Specifications
The unit operates in two quadrants: DC voltage remains positive while current can flow in either direction. It can energize a DUT as a source and absorb returned energy as a sink. In sink operation, recovered energy is fed into the connected AC grid. This supports charge-discharge work without requiring a separate dissipative load for every bidirectional channel.
The front panel provides an on/off button, LED status indication, and USB rather than a full graphical operator interface. Specify how operators will enter setpoints, view measurements, and handle faults. For expanded systems, ask TPS to confirm the compatible master and supervisory control arrangement.
| Selection item | Published specification | Buying implication |
|---|---|---|
| Power and range | 30 kW per unit; ten voltage classes from 60 to 2,000 V; current ratings from 40 to 1,000 A | Voltage and current depend on model; maximum values are not simultaneous. |
| AC supply | 208 V ±10%, or 380-480 V ±10%, three-phase; 45-65 Hz | Standard models are derated to 18 kW at 208 V. |
| Regulation | CV, CC, CP, CR; 16-bit ADCs/DACs | Define required modes and acceptance tolerances. |
| Measurement accuracy | Voltage ≤0.05% FS; current ≤0.1% FS | FS means full scale, not percentage of reading. |
| Regeneration efficiency | Model-specific peaks up to 95.1-96.5% | Published peak figures apply at full power and full output voltage. |
| Construction | 19-inch, 4U; forced-air cooling; optional water cooling | Select rack support and thermal provisions before ordering. |
Select the Voltage-Current Envelope
List minimum and maximum DUT voltage, continuous current, transient demands, and power in both directions. Each operating point must satisfy the selected voltage limit, current limit, and available power. Autoranging broadens usable combinations; it does not multiply the voltage and current nameplate ratings into additional power.
| PUB model | DC voltage range | DC current range |
|---|---|---|
| 10060-1000 | 0-60 V | 0-1,000 A |
| 10080-1000 | 0-80 V | 0-1,000 A |
| 10200-420 | 0-200 V | 0-420 A |
| 10360-240 | 0-360 V | 0-240 A |
| 10500-180 | 0-500 V | 0-180 A |
| 10750-120 | 0-750 V | 0-120 A |
| 10920-125 | 0-920 V | 0-125 A |
| 11000-80 | 0-1,000 V | 0-80 A |
| 11500-60 | 0-1,500 V | 0-60 A |
| 12000-40 | 0-2,000 V | 0-40 A |
All listed models share the 30 kW rating, subject to input and thermal conditions. For example, a 750 V/120 A unit can deliver 60 A at 500 V within its 30 kW envelope. A 500 V/100 A requirement equals 50 kW and exceeds one unit, even though neither individual voltage nor current rating is exceeded.
Low-voltage discharge requires another check: minimum sink voltage for maximum current. The table specifies 0.62 V for the 60 V and 80 V models, versus 3.7 V for the 2,000 V model. A zero-based voltage range does not establish full-current sinking at zero volts. Provide the complete discharge endpoint and cable drop for technical review.
Check ripple and measurement uncertainty against the DUT. For example, the 80 V model specifies ≤25 mV RMS ripple with a 300 kHz measurement bandwidth; the 750 V model specifies ≤200 mV RMS under that bandwidth. These limits are model-specific and cannot be compared directly with peak-to-peak values measured at a different bandwidth.
Match the Application and Control Functions
Battery Cycling and Converter Validation
For battery modules or packs, define charge and discharge limits, BMS communication, precharge, contactors, interlocks, and fault behavior. A bidirectional unit can cover both power directions, but the complete station still needs application-specific safety and test sequencing. For converter or on-board charger testing, provide the expected source-sink transitions and control-loop behavior.
Voltage regulation speed is selectable. Published 10-90% rise and 90-10% fall limits distinguish CV source operation at ≤10 ms from CC sink operation at ≤2 ms under the stated conditions. These figures do not specify every command response, logging interval, or source-sink transition. Define the actual waveform and verify performance at the DUT terminals.
Automation, Simulation, and Optional Functions
Built-in interfaces include isolated USB, Ethernet, and a 15-pin analog interface with selectable 0-5 V or 0-10 V signaling. Available interface options include CAN, CANopen, RS232, Profibus, Profinet, EtherCAT, and Modbus variants. Specify the exact module, command set, controller platform, and required update rate; an Ethernet connector alone does not establish protocol compatibility.
Function generation is an option. Battery simulation, PV curves, sequencing, and logging should be quoted with the required software, licenses, master configuration, and validation scope. Avoid assuming every application feature is enabled in the base power unit.
If your station only absorbs energy, compare the 30 kW regenerative DC load selection guide. For source-only requirements, the 30 kW programmable DC source guide helps narrow the architecture before pricing. TPS can review which approach matches the actual test sequence.
Plan AC, Rack, Cooling, and Parallel Integration
Facility Power and Regenerative Operation
For US installations, confirm whether the equipment location provides 208 V or a suitable supply within the specified 380-480 V range. Do not assume 30 kW is available from a standard unit on 208 V. Confirm any other proposed nominal voltage separately instead of treating the input specification as one continuous range.
The model tables give phase-current limits of ≤58 A at 208 V and ≤53 A at 400 V under their stated calculation conditions. These are planning inputs, not breaker selections. Have the electrical design account for protection, disconnects, conductor sizing, protective earth, and site rules for energy feedback. Verify whether upstream equipment permits reverse power flow.
Mechanical and Thermal Planning
The enclosure measures 483 × 177 × 668 mm, while overall depth is at least 802 mm. Weight is approximately 50 kg for air cooling and 56 kg with water cooling. Panel builders must allow structural support, lifting access, rear termination space, cable bend radius, touch protection, and service clearance.
Air flows from front to rear through temperature-controlled fans. The operating range is 0-50°C, but rated power is available only up to approximately 40°C. Obtain the relevant derating information for hotter cabinets. Water cooling is optional; specify coolant conditions and installation requirements before freezing the mechanical design.
Parallel Expansion and DC Interconnects
Master-slave and Share-Bus connections support coordinated parallel operation and current sharing. For a system composed of 30 kW units, 64 units give an arithmetic maximum of 1,920 kW. This is a platform ceiling, not a preapproved cabinet design. Confirm compatible devices, voltage class, firmware, master selection, AC capacity, and busbar protection.
For illustration, two 30 kW units provide 60 kW of aggregate rated power under suitable conditions. That does not create two independent test channels when their DC terminals are paralleled. Specify channel independence separately, together with fault isolation and the acceptable shutdown behavior.
DC connections use rear copper terminals. Size busbars or cables for continuous current, fault energy, mechanical loading, and temperature rise. Remote sense can compensate up to 5% of nominal voltage, but adequate conductor sizing remains essential. Submit your rack layout and operating profile through the TPS bidirectional power unit consultation page for configuration review.
Review Safety, EMC, and Reliability
The datasheet lists IEC/EN/UL 61010-1 and CSA C22.2 No. 61010-1 among its safety references. EMC references include EN 61326-1, EN 55011/CISPR 11 Class A Group 1, and FCC Part 15B Class A. Request declarations and any required certification records for the exact orderable configuration; a standards reference alone does not establish a particular listing or approval.
The unit is Class I, IP20 equipment for pollution degree 2, altitude up to 2,000 m, and noncondensing humidity up to 80%. The datasheet distinguishes reinforced insulation for the low-voltage models from basic insulation for models rated 200 V and above. Review the model-specific DC-to-earth limits rather than assuming unrestricted floating operation.
Adjustable overvoltage, overcurrent, and overpower protection plus overtemperature shutdown support equipment protection. Battery safety, emergency stops, isolation monitoring, discharge circuits, and cabinet-level compliance require a separate system design. For acceptance, define warm-up, measurement accuracy, fault tests, logging, and restart behavior. Ask for calibration, warranty, and service details in the quotation.
Build a Complete TPS RFQ
TPS can support product selection, equivalent solution evaluation, custom rack or cabinet integration, and engineering consultation for international B2B projects. The integration scope can include power distribution, wiring documentation, mechanical arrangements, and test-system coordination, as agreed for the project. Any alternative should be checked against the required electrical and control behavior.
Procurement should compare the complete configuration: power units, compatible master where required, interfaces, function options, software, cooling, interconnects, documentation, and acceptance work. Request confirmed availability, lead time, delivery terms, shipping destination coverage, warranty, and service arrangements. None should be inferred from the series name or treated as a guaranteed stock commitment.
- DUT and envelope: application, voltage window, charge/discharge current, continuous and peak power, duty cycle, and low-voltage endpoint.
- Facility: AC voltage, frequency, available capacity, regeneration constraints, ambient temperature, and cooling preference.
- Integration: unit count, independent channels or parallel system, existing master, rack dimensions, DC connections, and safety concept.
- Automation: controller, protocol, timing, logging, simulation functions, and required software or licenses.
- Purchase scope: quantity, delivery country and postal code, target commissioning date, acceptance criteria, and required compliance documents.
To move from a model shortlist to an actionable offer, request an EA-PUB 10000 4U quotation from TPS with these details. TPS can help align the power hardware and integration scope before your team approves the purchase.
Frequently Asked Questions
Can One Unit Provide 30 kW on 208 V Three-Phase Power?
Standard models are derated to 18 kW on 208 V ±10% input. For a 30 kW requirement, confirm a suitable higher-voltage facility supply or an engineered system configuration with TPS.
Does the 750 V/120 A Model Deliver 120 A at 750 V?
No. That point requires 90 kW. At 750 V, the 30 kW power limit corresponds to 40 A before additional derating. Check voltage, current, and available power together.
Is a Full Local Graphical Interface Included?
The front panel has LED indicators, an on/off button, and USB. Specify remote operation or a compatible master arrangement, and confirm the control workflow and optional functions in the quotation.
Is 96.5% Energy Recovery Guaranteed Across the Range?
No. The highest published figure applies to selected models under stated full-power, full-voltage conditions. Recovery varies with model and operating point. Estimate energy savings from your duty cycle and validated efficiency data.
Can TPS Quote a Complete Integrated Solution?
TPS can evaluate a product-only supply or a broader rack, cabinet, and test integration project. Provide the electrical profile, controls, facility conditions, documentation needs, and delivery scope so the offer identifies what is included.