WELCOME TO OUR BLOG

We're sharing knowledge in the areas which fascinate us the most
click

eTM1520 Series Compliance Testing Guide: IEC 61010-1, IEC 61326-1 & FCC Class B

By Lily September 23rd, 2026 202 views
This compliance and testing guide helps engineers and procurement teams evaluate the eTM-1520, eTM-1520F, and eTM-1520P 15V 20A DC bench power supplies. Compare IEC 61010-1 safety, IEC 61326-1 EMC, FCC Part 15 Class B planning, model selection, integration requirements, and RFQ evidence before choosing a supplier.
eTM1520 Series Compliance Testing Guide: IEC 61010-1, IEC 61326-1 & FCC Class B,TPS ELECTRIC LLC

For a low-voltage, high-current bench supply, compliance is not a checkbox attached after model selection. It is a project decision that connects electrical safety, EMC behavior, US emissions requirements, installation details, documentation, and supplier support. This guide helps system integrators, panel builders, procurement teams, and electrical engineers evaluate the eTM1520 Series for projects that reference IEC 61010-1, IEC 61326-1, and FCC Part 15 Subpart B, with Class B emissions as the preferred planning target.

Why compliance matters for eTM1520 projects

The eTM1520 platform is designed around a practical 0-15 V, 0-20 A, 300 W output envelope. That combination is suited to high-current PCB functional checks, mobile-device service, embedded-computing rails, electronics validation, fixture power, and controlled laboratory work. The shared chassis is approximately 280(D) x 130(W) x 165(H) mm. Catalog ripple guidance for the 15 V models is no more than 10 mVrms for voltage and 10 mArms for current. These are valuable selection facts, but none of them alone establishes safety or EMC compliance.

The risk changes when a supply moves from one engineer's bench into a repeatable production station, customer-facing service cart, enclosed fixture, or globally deployed test system. Procurement then needs traceable model identity, current documentation, stable configuration control, suitable markings, and an escalation path when a test laboratory or customer reviewer asks technical questions. Engineering needs to know which cables, load states, communication ports, software sequences, and grounding arrangements must be represented during testing.

For a BoFu decision, the correct question is not simply, "Does this power supply comply?" The better question is, "What evidence applies to the exact configuration we will purchase, and what additional system-level verification is required for our intended use?" TPS can supply the eTM1520 family, review equivalent options, and support model selection, integration, customization discussions, and compliance-oriented project planning for global B2B customers.

Compliance-first eTM1520 supplier selection path from application definition through RFQ evidence From bench requirement to RFQ-ready decision 1. Define use DUT, load, duty cycle market and environment 2. Choose model manual, 4-digit or programmable 3. Verify setup safety, EMC, wiring and representative modes 4. Lock RFQ evidence, options quantity and delivery Outcome: a quotation tied to the exact configuration, intended market, and required documents
Figure 1. A compliance-first workflow converts broad standards language into supplier deliverables.

Standards map: safety, EMC, and FCC Class B

IEC 61010-1: build the safety evidence package

IEC 61010-1 is the general safety framework for electrical equipment used in measurement, control, and laboratory applications. For an eTM1520-based bench or fixture, use it to structure the review of protection against electric shock, insulation and clearances, protective earthing, mechanical hazards, temperature, abnormal operation, markings, and instructions. The formal evaluation must use the edition and national adoption required by the destination market.

Request the current datasheet, input configuration, fuse information, enclosure and terminal details, safety-related instructions, and any available declarations, certificates, or test reports. Check that the model number and revision on the evidence match the delivered unit. If the supply is built into another machine or fixture, the final integrator remains responsible for the hazards introduced by access panels, mains wiring, output terminals, ventilation restrictions, and foreseeable misuse. TPS can help clarify the product configuration, but the system owner and qualified laboratory must determine the applicable conformity route.

IEC 61326-1: test the operating mode customers will actually use

IEC 61326-1 covers EMC emissions and immunity for measurement, control, and laboratory equipment. It is not enough to power the unit at idle. The test plan should identify the intended environment and exercise a representative worst-case mode: actual input option, output voltage and current, real or representative DUT, typical DC-lead length, communication cable if used, and the sequence profile when evaluating the programmable model.

Document what constitutes acceptable performance during immunity testing. A momentary display change, output interruption, protection trip, communication error, or DUT reset may have different consequences in an R&D bench than in a production fixture. Agree on the performance criteria before testing. For practical preparation, review TPS guidance on EMC pre-compliance testing and EMC testing for power supplies and devices.

FCC Part 15 Subpart B: prioritize Class B without overclaiming

For a US-market digital or switching product that falls within the rules for unintentional radiators, 47 CFR Part 15 provides the regulatory framework, including conducted and radiated emissions provisions. Class B is the more conservative project target for equipment intended for residential or mixed-use environments; it can also be a useful procurement preference for customer-facing laboratories and commercial spaces. Applicability and the required authorization path should be confirmed for the final equipment, not inferred from this article.

Ask whether the available FCC evidence covers the exact eTM model and options, which ports were populated, what support equipment and loads were used, and whether the report addresses Class A or Class B limits. If no applicable report is available, treat Class B as a design and test target. A repeatable conducted-emissions setup matters: TPS's guide to LISN setup and wiring mistakes can help teams avoid false failures before a formal lab visit.

Standards map showing IEC 61010-1 safety, IEC 61326-1 EMC, and FCC Part 15 Class B emissions around the final eTM1520 installation Final eTM1520 configuration + DUT cables • load • enclosure IEC 61010-1 Safety construction and evidence IEC 61326-1 Emissions + immunity behavior FCC Part 15 Subpart B Class B emissions planning preferred
Figure 2. The standards overlap at the final configuration; product data alone does not replace system verification.

Model selection: eTM-1520 vs. eTM-1520F vs. eTM-1520P

All three models share the same 0-15 V, 0-20 A, 300 W electrical class and compact chassis. Selection therefore depends less on raw output power than on operator workflow, display needs, communication depth, protection controls, and repeatability. Use the table below as an RFQ filter, then confirm the chosen options with TPS.

Decision point eTM-1520 eTM-1520F eTM-1520P
Common output 0-15 V, 0-20 A, 300 W 0-15 V, 0-20 A, 300 W 0-15 V, 0-20 A, 300 W
Front-panel workflow 3-digit standard series; V/I preset, power display, output ON/OFF 4-digit F series; V/I preset, power display, output ON/OFF 4-digit programmable series; menu, protection keys, stored parameters
Remote function Optional rear interface for output control/readback; not for programming Optional rear interface for output control/readback; not for programming Rear communication supports setting and programming; interface option must be confirmed
Best-fit buying case Cost-controlled manual bench and service work Manual stations needing clearer 4-digit visual setup Repeatable sequences, validation, burn-in, or semi-automated stations
RFQ confirmation Input configuration, interface, evidence, lead set Display/setup expectations, interface, evidence List limits, commands, interface, protection behavior, evidence

Choose the standard or F model for controlled manual work

Choose the eTM-1520 when the process is fundamentally manual and work instructions provide repeatability. It supports voltage/current preset, power display, front-panel output switching, and optional rear communication for readback and output control. Choose the eTM-1520F when a 4-digit front panel improves operator confirmation, logging, photography, or shift-to-shift setup consistency. Neither model should be quoted as a programmable source; verify the intended remote-control boundary before integrating it into software.

Choose the P model for repeatable profiles and automation

Choose the eTM-1520P when the test method needs hardware List sequence output, six quick parameter memories, remote setting/programming, or protection functions for over-voltage, over-current, over-power, over-temperature, and short circuit. These features can reduce operator variation in brownout checks, stepped-load workflows, burn-in, and functional verification. The RFQ should still define the required interface, command expectations, number and timing of steps, trigger behavior, fault recovery, and software ownership.

Decision matrix comparing eTM-1520, eTM-1520F, and eTM-1520P by workflow and automation depth Select by workflow, not only by watts Automation and repeatability → Control depth → eTM-1520 manual value eTM-1520F 4-digit visibility eTM-1520P List + programming
Figure 3. The three models share the output envelope but address different levels of repeatability and control.

Integration and pre-compliance test plan

Control heat, high-current wiring, grounding, and access

The nominal chassis dimensions do not include the service envelope. Preserve rear airflow, cable bend radius, mains inlet and fuse access, communication connector access, and clear visibility of CV/CC state. A 20 A output deserves short, appropriately rated leads, secure terminals, controlled contact resistance, and a documented grounding arrangement. Review voltage drop at the DUT under worst-case current; otherwise the station may pass a no-load check yet fail functional testing at the fixture.

For cabinet or fixture integration, separate noisy mains and DC power paths from sensitive signal cables, avoid uncontrolled chassis loops, and keep the tested cable route consistent with production. TPS's discussion of grounding and bonding failure modes provides useful preparation. Safety planning should also include the four core checks described in electrical safety testing for power electronics.

Create one reproducible configuration record

Before pre-compliance work, freeze a configuration sheet: supply model and revision, serial number, AC input option and selector position, fuse, output setpoint, steady and peak current, DUT and load identity, lead type and length, communication port and cable, firmware/software revision, enclosure state, grounding points, and operator mode. For the P model, include the List sequence and protection settings. Photograph the setup from several angles.

Run safety checks and EMC prescans with the final accessories wherever possible. Conducted and radiated emissions should represent active operation, not a quiet standby condition. Immunity tests should exercise the functions that matter to the customer and record whether the supply recovers automatically, requires intervention, changes output, loses communication, or trips protection. If a result changes after a cable or filter modification, revise the controlled configuration rather than relying on an undocumented bench fix.

Pre-compliance configuration record showing AC input, eTM1520 supply, cables, DUT load, and evidence package Freeze the tested configuration AC input option • fuse • PE eTM1520 model • revision setpoints • mode Leads + comms type • length • route DUT + load state • duty cycle Photos + settings + test results + controlled document revision
Figure 4. Reproducible records separate product behavior from fixture, cable, DUT, and setup variables.

RFQ checklist and supplier evaluation

A strong RFQ should let TPS quote the correct model and tell both engineering and procurement what remains to be verified. Avoid a one-line request for a "15 V 20 A supply." Include the intended result and the acceptance evidence.

Engineering inputs

  • DUT voltage range, steady current, peak current, and 300 W boundary.
  • Manual, 4-digit, or programmable workflow.
  • List sequence, memory, protection, and fault-recovery requirements.
  • RS485, RS232, or USB option; required commands and software environment.
  • Lead length, connector, fixture, airflow, grounding, and duty cycle.
  • IEC 61010-1, IEC 61326-1, and FCC Class B evidence requested.

Commercial inputs

  • Sample, pilot, and forecast production quantities.
  • Destination country, input configuration, labels, and manual language.
  • Required certificate/report identifiers and document revisions.
  • Target delivery date, packaging, warranty, and after-sales expectations.
  • Need for equivalent solutions, custom leads, labels, or integration support.
  • Technical contact, buyer contact, and deadline for clarification.

Supplier evaluation should compare more than unit price. Confirm that the offered model matches the required workflow, that optional interfaces are explicitly listed, and that compliance evidence is current and applicable. Ask who supports engineering questions during sample evaluation and what happens if the formal setup requires a configuration change. For a broader documentation strategy, review TPS guidance on repeatable compliance and documentation for integrated power systems. A closely related eTM-1502 family compliance guide also shows how the same selection logic changes for a 150 V / 2 A application.

Request a compliance-aware solution from TPS

Send TPS your DUT profile, intended environment, destination market, compliance targets, interface needs, quantity plan, and required documents. TPS can support product selection, equivalent-solution review, customization and integration discussions, engineering consultation, and global B2B project coordination.

Start with the eTM-1520 for manual bench work, the eTM-1520F for 4-digit operator visibility, or the eTM-1520P for programmable sequences. Ask sales to confirm the exact configuration and available evidence before purchase.

FAQ

Are the eTM-1520, eTM-1520F, and eTM-1520P certified to all three standards?

The provided specification does not include certificate or report identifiers. Ask TPS for current evidence tied to the exact model, revision, input option, communication option, and destination market. This guide is a compliance-planning and RFQ tool, not a certification statement.

Why prioritize FCC Part 15 Class B?

Class B is relevant for residential and mixed-use environments and can provide a more conservative emissions target for customer-facing labs or commercial spaces. Final applicability, authorization procedure, and test configuration must be determined for the complete equipment.

What is the practical difference among the three models?

They share the 0-15 V, 0-20 A, 300 W envelope. The eTM-1520 is the standard 3-digit manual model, eTM-1520F adds a 4-digit front-panel workflow, and eTM-1520P adds programmable List output, six memories, remote setting/programming, and five protection functions.

Does a compliant supply make the final fixture compliant?

No. Enclosure, grounding, wiring, cable length, load behavior, communication ports, airflow, software mode, and operator access can change safety and EMC results. Verify the complete representative configuration.

What should procurement request before approving a PO?

Request the quoted configuration, current datasheet, model-specific available test evidence, input and communication options, mechanical details, user instructions, label/manual requirements, sample plan, lead time, warranty, and technical support contact. Make document applicability an acceptance item.

eTM3010 Series Power Design Guide: Select, Integrate, and RFQ a 30V 10A Bench Supply,TPS ELECTRIC LLC
Previous
eTM3010 Series Power Design Guide: Select, Integrate, and RFQ a 30V 10A Bench Supply
Read More
CP1000 Industrial Applications: Selecting a 1kW AC/DC Lithium Battery Charger for AGV, Medical, and OEM Systems,TPS ELECTRIC LLC
Next
CP1000 Industrial Applications: Selecting a 1kW AC/DC Lithium Battery Charger for AGV, Medical, and OEM Systems
Read More

Contact Us

Name *
Company Name *
Email *
Comment *
Get in Touch with TPS
Name *
Business Email *
Company Name
Country/Region
Inquiry Type *
Application / Industry
What problem are you facing right now?
What are you trying to achieve?
Target Timeline
Budget Range
We use Cookie to improve your online experience. By continuing browsing this website, we assume you agree our use of Cookie.