WELCOME TO OUR BLOG

We're sharing knowledge in the areas which fascinate us the most
click

eTM305F and eTM305P Compliance Testing Guide: IEC 61010-1, IEC 61326-1, and FCC Class B

By Lily September 30th, 2026 205 views
Evaluate the eTM305F and eTM305P 30V 5A DC bench power supplies for IEC 61010-1 safety, IEC 61326-1 EMC, and FCC Part 15 Class B requirements. Compare manual and programmable functions, identify integration risks, and build an RFQ-ready compliance plan for laboratory, engineering, and production test applications.
eTM305F and eTM305P Compliance Testing Guide: IEC 61010-1, IEC 61326-1, and FCC Class B,TPS ELECTRIC LLC

Selecting a 30 V, 5 A bench supply for an engineering or production program is not finished when the electrical ratings match. The buying team must also determine which safety and EMC requirements apply, how the supply will be configured in the test system, and what evidence the supplier can provide before purchase approval. This guide maps the eTM-305F DC bench power supply and eTM-305P programmable DC power supply to an RFQ-ready evaluation based on IEC 61010-1, IEC 61326-1, and FCC Part 15 Subpart B, with Class B treated as the preferred emissions target where applicable.

1. Decision Summary: What a Buyer Should Confirm

Both models cover the same core operating window: 0-30 V, 0-5 A, and up to 150 W. The catalog specifies voltage setting accuracy of no more than 0.1% + 5 digits, current setting accuracy of no more than 0.2% + 10 digits, voltage ripple of no more than 10 mVrms, current ripple of no more than 10 mArms, and a 280 × 130 × 165 mm enclosure. These are useful screening values, but acceptance criteria should be tied to the exact order configuration and verified under the project load profile.

Choose the F version when the task is mainly manual setup, preset voltage/current, output enable/disable, and optional remote read/control. Choose the P version when production repeatability requires hardware List sequences, six quick-recall parameter groups, remote setting/programming, and defined protection workflows. For either model, the compliance decision must be based on intended use, mains configuration, communication option, cables, load, accessories, and target market—not the model name alone.

RFQ compliance decision path Four-step path from intended use to evidence review and quotation release. 1. Define useLab, service, education,or production test 2. Freeze buildInput, interface, cables,firmware, accessories 3. Test mappingSafety, immunity,conducted/radiated EMC 4. Release RFQEvidence, deviations,qty and delivery
A compliant procurement decision starts with the intended configuration, not a generic standards list.

2. eTM-305F vs. eTM-305P: Product Fit Before Compliance Testing

Decision item eTM-305F eTM-305P RFQ implication
Output envelope 0-30 V, 0-5 A, 150 W 0-30 V, 0-5 A, 150 W Provide continuous and transient DUT demand, not only nominal power.
Primary workflow Manual preset and monitoring Programmable and repeatable sequences Select according to operator variability and automation needs.
Rear communications Optional RS485/RS232/USB; control/readback, not deep programming Optional RS485/RS232/USB; setting and programming supported Freeze interface, cable, protocol, and host configuration before EMC testing.
Sequence and memory Not positioned for automated List sequences Hardware List output and six quick memories Specify sequence steps, dwell time, trigger behavior, and recovery expectations.
Protection Confirm order-specific protection behavior OVP, OCP, OPP, OTP, and short-circuit protection are listed Define trip, latch/restart, logging, and DUT-safe state in acceptance criteria.

For a manual engineering bench, review the eTM-305F specifications and quote options. For repetitive validation or a production fixture, review the eTM-305P programming and interface options. TPS can support model selection, interface definition, test planning, integration consultation, and an equivalent or customized project solution for global B2B customers.

3. How IEC 61010-1, IEC 61326-1, and FCC Part 15 Map to the Project

IEC 61010-1: Safety for Measurement, Control, and Laboratory Equipment

IEC 61010-1 provides general safety requirements for electrical test and measurement, industrial process-control, and laboratory equipment. For a bench supply, the project review typically considers protection against electric shock, insulation, protective bonding, mechanical hazards, temperature, fire, markings, instructions, and reasonably foreseeable misuse. The applicable edition, national adoption, overvoltage category, pollution degree, altitude, and use environment belong in the compliance plan.

IEC 61326-1: EMC Emissions and Immunity

IEC 61326-1 covers EMC emissions and immunity for measurement, control, and laboratory equipment used in industrial and non-industrial locations. The intended electromagnetic environment affects the test plan. The buyer and laboratory should define operating modes, ports, cable lengths, loads, performance criteria, and what constitutes an acceptable temporary degradation or recovery.

FCC Part 15 Subpart B: First Decide Whether It Applies

For U.S. projects, do not automatically convert “Class B preferred” into a compliance claim. 47 CFR Part 15 Subpart B addresses unintentional radiators, but §15.103 includes exemptions, including digital devices used exclusively as industrial, commercial, or medical test equipment. The exemption depends on exclusive use and the functions of the complete device; mixed-use equipment may not qualify. Even when exempt, the rule text recommends endeavoring to meet the technical standards, and customers may still request Class B emissions evidence as a contractual risk-control measure.

Standards applicability map Three standards map to safety, EMC immunity and emissions, and U.S. unintentional radiator obligations. Intended configuration IEC 61010-1Safety constructionFaults, heat, markings IEC 61326-1Emissions + immunityModes, ports, criteria FCC Part 15 BApplicability firstClass B if required Output: agreed test matrix + evidence package + controlled production build
Standards mapping must be tied to the exact model, options, operating modes, cables, and destination market.

4. IEC 61010-1 Safety Evaluation Plan

Start by documenting intended use: benchtop location, trained or untrained operator, accessible terminals, input supply, maximum ambient, altitude, duty cycle, and foreseeable misuse. A 150 W source can damage a DUT or wiring even when the output voltage is below typical hazardous-voltage thresholds. Current limiting, terminal accessibility, wire rating, touch protection, output enable state, and safe shutdown therefore need explicit review.

The evaluation sample must represent the saleable build. If the order includes a manual 100/220 V selector, optional communication board, alternate connector, cable, fuse, fan, or firmware, list those items in the configuration record. Review protective-earth continuity, insulation coordination, dielectric strength, leakage/touch current as applicable, accessible part temperatures, abnormal operation, short circuit, blocked ventilation, component ratings, fuse suitability, and stability. Capture photographs and component identifiers so purchasing can prevent silent substitutions.

For operators, define a repeatable startup sequence: inspect leads, confirm input selection, set voltage and current limits, connect the DUT with output off, then enable the output. For the P model, also define the safe state after OVP, OCP, OPP, OTP, short circuit, communication loss, or interrupted sequence. TPS can help convert the application information into an order configuration, integration review, and project-specific verification plan. For broader preparation, use the TPS guide to four electrical safety checks before certification.

5. IEC 61326-1 EMC and FCC Class B Plan

EMC testing should exercise modes that can create the highest emissions or reveal the weakest immunity behavior. For both models, include representative high-load and low-load operation, CV/CC transitions, output switching, and the longest intended leads. For the P model, run List sequences and active communications because digital activity, step changes, and interface cables may alter the emissions profile. Test with the specified AC input configuration, production cable set, representative load or DUT simulator, and normal grounding arrangement.

An IEC 61326-1 plan typically combines emissions with immunity phenomena selected for the applicable environment and ports. Record functional performance before, during, and after each exposure. Acceptance criteria may include no unsafe output, no unexpected enable, no loss or corruption of stored settings, controlled recovery, and bounded output deviation. The laboratory—not the marketing copy—should confirm the exact test levels and methods for the declared environment and edition.

For FCC Class B planning, conducted emissions on the AC mains and radiated emissions are central where Part 15 applies. Class B is a sensible preferred procurement target for mixed-use, educational, light-commercial, or potentially residential-adjacent deployments, but the responsible party must document the applicability decision. If the equipment is marketed exclusively as industrial/commercial test equipment, have regulatory counsel or the chosen lab evaluate §15.103(c) rather than making an informal exemption assumption.

EMC configuration checklist Bench supply connected to mains, load, communication host, and monitoring equipment with configuration controls. eTM-305F / 305PDefined mode + load AC mains / LISNCorrect input build Load / DUT simulatorCV, CC, transitions Host / interfaceCable + active traffic Performance monitorOutput + safe recovery Freeze every cable, option, mode, load, and recovery criterion in the test plan.
A passing result is only meaningful when the tested configuration matches the supplied configuration.

Pre-compliance work can reduce re-test cost. Establish noise baselines, scan operating modes, preserve cable routing, and investigate narrow margins before the formal lab slot. TPS resources explain when an EMC pre-compliance lab is justified, how to avoid LISN setup and wiring errors, and how to build a broader EMC test program for power supplies and devices.

6. Integration and Installation Controls That Affect the Result

Wiring, Grounding, and Ventilation

Use short, adequately rated output leads and verify voltage at the DUT under maximum current. Route DC output, AC input, and communication cables to limit coupling. Do not block the rear fan or enclosure vents; record the clearance used during thermal and EMC evaluation. The front grounding terminal, protective-earth path, DUT reference, oscilloscope earth, fixture metalwork, and cable shields must be treated as one documented system. Unplanned ground loops can create both measurement errors and emissions failures; the TPS article on grounding and bonding failure modes provides a useful design review checklist.

Configuration and Change Control

Record model, serial number, hardware revision, firmware, input-voltage arrangement, fuse, communication option, cable part numbers, software version, List program, protection settings, load, and environmental conditions. Any change to a switching device, filter, fan, interface board, enclosure seam, cable, or firmware timing should trigger a documented impact review. Procurement should require notice and approval for changes that can affect safety, EMC, performance, or test evidence.

7. RFQ Evidence Package: What to Send and What to Request

A strong RFQ allows TPS to confirm fit without repeated clarification. Send the information below, and request a response that identifies verified facts, optional items, deviations, and evidence availability.

Buyer inputs

  • Application, user environment, and destination countries
  • DUT voltage/current profile, inrush, duty cycle, and tolerance
  • eTM-305F or eTM-305P workflow requirement
  • Quantity, pilot quantity, forecast, delivery window, and Incoterm
  • Input voltage, plug/cable, interface, host, and protocol
  • Required standard editions, national deviations, and Class B preference
  • Fixture layout, lead lengths, grounding, ambient, and ventilation constraints

Supplier response

  • Order code and configuration-specific datasheet
  • Confirmed ratings, options, interfaces, and protection behavior
  • Compliance declarations, reports, certificates, or gap statement
  • Sample plan and acceptance-test proposal
  • Production change-control and traceability approach
  • MOQ, pricing basis, lead time, warranty, and support scope
  • Customization, integration, and engineering consultation options
RFQ evidence gate Five evidence gates that lead to an approved sample and production purchase order. Fit confirmedV / A / W / mode Build frozenOptions + cables Evidence readScope + editions Sample passedFAT / validation PO releasedControlled build Do not release volume purchasing on a model-name match alone.
Use a sample and evidence gate before volume release, especially when options or compliance targets are project-specific.

Move from Standards List to an RFQ-Ready Configuration

TPS provides this product class and can support selection, equivalent solutions, customization, test planning, integration consultation, and project coordination for global B2B customers. If your bench uses static presets and basic monitoring, request an eTM-305F quotation. If your process needs programmable sequences, memory recall, and remote setting, request an eTM-305P solution review. Include the RFQ inputs above so sales and engineering can confirm the configuration, available compliance evidence, sample plan, lead time, and commercial terms.

FAQ

Are the eTM-305F and eTM-305P automatically certified to all three standards?

No. A standards mapping is not a certification claim. Ask TPS to identify the order-specific compliance status, applicable editions, report scope, tested options, and any remaining system-level verification.

Should every U.S. project require FCC Class B testing?

Not automatically. Part 15 applicability depends on the device functions and exclusive intended use. Certain industrial, commercial, or medical test equipment may be exempt under §15.103(c), but mixed-use equipment may not qualify. Class B can still be adopted as a contractual emissions target when the deployment or customer requires it.

Which model is better for a production test fixture?

The eTM-305P is usually the stronger fit when the fixture needs List sequences, six stored parameter groups, programmable remote setting, and repeatable protection behavior. The eTM-305F is appropriate when manual presets and basic control/readback are sufficient.

What configuration should be used for EMC testing?

Use the production-intent model with the ordered input, interface, firmware, cables, accessories, load, grounding, and operating modes. Exercise high-emission and vulnerable modes, including communications and programmed steps for the P model.

What information shortens the quotation cycle?

Send destination market, application, DUT profile, quantity, schedule, input and interface options, compliance editions, cable and fixture constraints, sample acceptance criteria, and required evidence. This lets TPS return a more precise technical and commercial proposal.

TBM750-53KTIF-S Power Design Guide: Build an RFQ-Ready 53kW 750V AC-DC System,TPS ELECTRIC LLC
Previous
TBM750-53KTIF-S Power Design Guide: Build an RFQ-Ready 53kW 750V AC-DC System
Read More
TDM750T14-13K5IRT Industrial Applications: 13.5 kW Bidirectional DC-DC Power for Battery Formation, Regenerative Aging, and Test Systems,TPS ELECTRIC LLC
Next
TDM750T14-13K5IRT Industrial Applications: 13.5 kW Bidirectional DC-DC Power for Battery Formation, Regenerative Aging, and Test Systems
Read More

Contact Us

Name *
Company Name *
Email *
Comment *
Get in Touch with TPS
Name *
Business Email *
Company Name
Country/Region
Inquiry Type *
Application / Industry
What problem are you facing right now?
What are you trying to achieve?
Target Timeline
Budget Range
We use Cookie to improve your online experience. By continuing browsing this website, we assume you agree our use of Cookie.