A programmable DC source becomes a purchasing decision when the test team can show exactly which operating points it must deliver. For industrial converter validation, automated production testing, and energy-system development, the EA-PSI 10000 2U Series combines adjustable DC output with a compact rack format and remote control. The practical outcome is a source specification that engineering can approve and procurement can quote.
TPS ELECTRIC LLC supports global B2B customers with this product category, application selection, and project integration consultation. Start with the EA-PSI 10000 2U product range, then evaluate voltage headroom, current demand, available mains, and protection requirements. This guide focuses on three relevant models and the information TPS needs to propose a suitable configuration or discuss an equivalent solution.
1. Identify the Right Industrial Use Case
The series offers model-dependent voltage limits from 60 to 1,500 V and power classes of 1.5 or 3 kW. Its value is controlled, repeatable source behavior in 19-inch racks: converter input testing, supervised battery charging, PV or fuel-cell source emulation, and configurable production fixtures.
For a business owner, the purchasing question is whether one configurable station can cover the intended product mix. For engineers, it is whether the source reaches every required point with acceptable ripple and response. For integrators and panel builders, rack depth, thermal management, interfaces, and safe access determine the real installation scope. Procurement should compare that complete scope rather than unit price alone.
2. Select by Voltage, Current, and Power
Autoranging expands the usable voltage-current envelope within the rated power ceiling. Maximum voltage and maximum current are separate limits; they are not simultaneously available across the full range. At a positive output voltage, use Iavailable = min(Irated, Pavailable / Voutput), then allow for dynamic behavior and installation conditions.
| Model | Voltage / current limits | 208–240 VAC power | 110–127 VAC power | First evaluation |
|---|---|---|---|---|
| EA-PSI 10360-15 2U | 0–360 V / 0–15 A | 1,500 W | 1,200 W | Mid-voltage converters |
| EA-PSI 11000-10 2U | 0–1,000 V / 0–10 A | 3,000 W | 1,500 W | High-voltage DC inputs |
| EA-PSI 11500-06 2U | 0–1,500 V / 0–6 A | 3,000 W | 1,500 W | Higher-voltage, lower-current loads |
The manual specifies single-phase input ranges of 110–127 VAC or 208–240 VAC, each with ±10% tolerance, at 45–65 Hz. Low-line operation reduces output power. A US project supplied from 120 VAC therefore needs a different power calculation from a station using 208 or 240 VAC.
Check Real Working Points Before Requesting a Quote
For the 360 V / 15 A model, 100 V at 12 A requires 1.2 kW and fits the nominal low-line power limit, with no power margin. At 300 V, the full-power ceiling permits 5 A; at low line it permits 4 A. A request for 360 V at 15 A would require 5.4 kW and exceeds this model’s capability.
The 1,000 V configuration supplies up to 3 A at 1,000 V with 3 kW available. The 1,500 V configuration supplies up to 2 A at 1,500 V under the same power condition. On low-line input, those calculated limits become 1.5 A and 1 A. These are power-envelope calculations, not guaranteed transient-performance results.
3. Translate Applications into Acceptance Tests
Industrial DC/DC Converter Validation
Use the source to sweep a converter’s specified input window, check startup thresholds, and compare efficiency at defined loads. A 300 V, 4 A input point requires 1.2 kW; a 700 V, 3 A point requires 2.1 kW and a higher-voltage model with sufficient available power. State startup current, input capacitance, cable length, and any reverse-energy behavior.
Acceptance should include stable operation at minimum, nominal, and maximum input voltage, predictable current limiting, and successful fault recovery. Add external measurement where the test uncertainty requires it. TPS can help connect the source selection to fixture wiring, measurement needs, and an agreed validation scope.
PV and Fuel-Cell Converter Development
The built-in function generator supports PV and fuel-cell characteristics, including an extended PV function described in relation to EN 50530. This allows development teams to evaluate converter behavior against programmed source curves rather than a stiff voltage source alone. Define open-circuit voltage, short-circuit current, maximum-power points, and required sweep or profile timing.
A simulation function is not evidence that an entire inverter test meets a standard. Confirm curve fidelity, acquisition method, and dynamic response against your procedure. TPS can review whether this source platform, another configuration, or a different power architecture fits the project.
Supervised Charging and Production Screening
For battery-related work, scope this source to controlled charging with suitable BMS supervision, temperature monitoring, and isolation. Discharge cycling requires additional equipment. Use the battery test rack architecture checklist when defining energy paths and channel protection.
For production screening, define output sequences, dwell periods, pass/fail limits, serial-number records, and restart rules. Recipe control and panel locking help standardize operation, but the station still needs independent safeguards. Ask TPS to review the source, rack, harness, and controls together when a repeatable production solution is the purchasing objective.
4. Engineer the Rack and Control System
Mechanical, Thermal, and Electrical Planning
The manual gives a 462 mm enclosure depth and a minimum total device depth of 559 mm; cable bends and service space need additional allowance. Use support rails suitable for the selected unit: approximately 9.5 kg for 1.5 kW versions and 12.7 kg for 3 kW versions. Cooling flows front to rear, with at least 300 mm clearance behind the standard air-cooled equipment.
Provide guarded terminals, protective earth, appropriate disconnects, and properly rated DC cables. The source’s IP20 construction is intended for suitable indoor installation, not direct exposure to dust or moisture. Coordinate these details with the test rack layout and service-access guide. The device’s internal protections do not replace a system safety design.
Remote sensing can compensate cable drop up to 5% of nominal voltage, within the device’s output limits. Route sense wiring according to the manual. External DC sources require careful polarity control: the manual states there is no internal reverse-polarity protection. Battery-connected installations also need a defined means of isolation and protection against fault energy.
Automation and Parallel Expansion
USB, Ethernet, and a galvanically isolated analog interface are built in. The analog range is selectable between 0–5 V and 0–10 V. Optional industrial communication modules include CANopen, Profinet, and EtherCAT; specify the exact protocol and module in the quotation. Separate a supervisory command rate from the actual waveform or measurement bandwidth you require.
The manual describes master-slave parallel operation of up to 64 compatible units using both the master-slave bus and Share bus. TPS should confirm voltage compatibility, firmware, wiring, and total input power before proposing expansion. Compare the series configurations against the complete channel plan; parallel units increase available current and power, not the individual voltage rating.
5. Verify Compliance and Reliability Evidence
The supplied manual lists IEC/EN/UL/CSA 61010-1 safety references, EN 61326-1, EN 55011/CISPR 11 Class B, and FCC Part 15B Class B. Treat these as documented references for evaluation. Request the applicable declaration, test evidence, and any required third-party listing for the exact order code; listing a standard is not proof of certification.
The documented operating environment is 0–50°C, up to 80% noncondensing relative humidity, and altitude up to 2,000 m. Tolerance-based specifications use a warmed-up unit at 23°C. Evaluate rack inlet temperature and sustained duty rather than assuming that a room-temperature trial proves full-load reliability.
Ripple can materially affect a converter test: the manual lists 300 mV peak-to-peak for the 360 V model, 2,000 mV for the 1,000 V model, and 6,500 mV for the 1,500 V model, measured with 20 MHz bandwidth. Define DUT tolerance and measurement conditions before accepting a higher voltage rating as an upgrade.
TPS can support integration and EMC consultation around the power subsystem. For early planning, review EMC test-bench design considerations. Agree which checks belong to the source, assembled rack, and final customer system.
6. Prepare a Decision-Ready RFQ
Send TPS a requirement package that permits both a technical fit review and a commercial comparison. Include:
- Load profile: minimum, nominal, and maximum voltage/current pairs; continuous power; startup demand; duty cycle; and returned energy.
- Site and installation: AC voltage/frequency, rack drawing, cooling conditions, cable lengths, grounding, and destination country.
- Control and evidence: interface/protocol, sequence timing, logging, accuracy, ripple limits, required compliance documents, and acceptance procedure.
- Commercial scope: prototype and production quantities, target delivery date, ship-to location, accessories, integration work, and required support.
Ask the quotation to identify the order code, installed options, included documentation, delivery assumptions, warranty terms, and exclusions. Availability, lead time, pricing, calibration evidence, and customization feasibility need project confirmation. For repeat orders, request configuration control and a process for reviewing substitutions.
TPS can supply this category of programmable DC source and support model selection, equivalent-solution assessment, rack integration, and engineering consultation for global B2B projects. Customization should be defined as an agreed project scope, with feasibility and deliverables confirmed before purchase.
7. Frequently Asked Questions
Can the 1,500 V model deliver 6 A at 1,500 V?
No. That point requires 9 kW. The 3 kW limit allows up to 2 A at 1,500 V with the appropriate high-line AC input. At the documented low-line derating of 1.5 kW, the calculated limit is 1 A.
Can this supply perform regenerative battery cycling?
Not by itself. This PSI configuration provides source operation. Battery discharge or returned-energy testing requires a suitable electronic load or bidirectional solution. Ask TPS to evaluate the entire charge/discharge architecture and the required supervision.
Will a 120 VAC installation provide full rated power?
No. The supplied manual specifies low-line power of 1.2 kW for 1.5 kW models and 1.5 kW for 3 kW models. Include the actual site voltage in the RFQ so the source is selected against available power.
Does the standards table guarantee approval of my rack?
No. A source’s documented standards references do not establish approval of the assembled system. Request configuration-specific evidence and define the rack’s applicable safety and EMC requirements, installation conditions, and acceptance responsibilities.
Can TPS support more than the power supply purchase?
Yes. TPS can review selection, equivalent solutions, integration needs, and engineering consultation for a global B2B project. Provide the rack layout, operating points, interface, quantity, destination, and schedule so product supply and project support can be quoted with clear boundaries.
