The YB-B Series combines single-phase EMI filtering, an IEC-style power inlet, and model-dependent switching or fuse functions in one compact power-entry component. For system integrators, panel builders, electrical engineers, and procurement teams, that integration can reduce separate parts, shorten internal mains wiring, and create a cleaner equipment interface. The important buying decision, however, is not simply whether a filter is rated for the line voltage. The selected configuration must match current, protection strategy, panel cutout, termination method, grounding, and the final equipment's EMC target.
The series covers 1–10 A, 115/250 V operation, and DC to 400 Hz, with options including one or two fuses, a two-pole rocker switch, quick-connect terminals, and wire leads. This guide turns those options into an RFQ-ready selection process. For current availability and configuration support, review the YB-B Series product page and contact TPS with the project data listed below.
What the YB-B Series Integrates
A conventional AC input assembly may require an inlet, a line filter, a fuse holder, a switch, brackets, and several jumper wires. Every added interface consumes panel area, adds assembly work, and introduces another connection that must be documented and inspected. The YB-B Series consolidates the inlet and EMI filter, while selected cases also integrate single- or double-fuse provisions or a two-pole rocker switch.
This architecture is useful when a compact machine, instrument, test device, power supply, or household-type product needs an orderly mains entry point. It is also relevant to build-to-print projects in which repeatable cutouts and wiring are essential. Teams designing the broader enclosure can compare these requirements with TPS guidance on custom sheet-metal enclosures for power electronics or the practical considerations in industrial control cabinets for automation.
Published Specifications and Boundaries
The following values come from the YB-B specification and current TPS product listing. They define the series envelope, not an automatic approval for every application or every part-number combination.
| Selection item | Published series information | RFQ action |
|---|---|---|
| Topology | Single-phase EMI filter with IEC socket/inlet format | Confirm line, neutral, and protective-earth architecture |
| Operating voltage/frequency | 115/250 V; DC to 400 Hz | State nominal input, tolerance, and actual line frequency |
| Rated current | 1–10 A | State continuous RMS current, peak/inrush current, duty cycle, and ambient temperature |
| Protection/function options | One or two fuses; two-pole rocker switch on selected versions | Define poles interrupted, fuse size/type, rating, and service requirements |
| Output connection | 6.3 × 0.8 mm or 4.0 × 0.8 mm quick-connect; wire option | Specify connector size or wire length, gauge, color, and termination |
| Construction | Ultra-small and snap-in versions; multiple case options | Attach panel drawing and identify case/cutout constraints |
| Switch color | Red, green, or standard black, except B8 according to the specification | Identify operator-interface and marking requirements |
The available case families distinguish functional combinations. The specification identifies B1/B9/B11/B13/B15 as single-fuse cases; B2/B10/B12/B14/B16 as double-fuse cases; and B3/B6/B7/B8 as switch cases. These groups are useful for narrowing the mechanical concept, but they do not replace a complete order code and approved drawing. Dimensions, rear clearance, mounting method, and suggested panel cutout vary by case.
How to Select the Configuration
1. Start with electrical stress, not nominal current alone
Select a current class only after calculating continuous RMS load, permissible temperature rise, equipment ambient, connector derating, and expected inrush. A switch-mode power supply may draw a short charging surge that is far higher than steady-state current. Fuse coordination must consider that surge, the downstream fault current, conductor protection, and the required interrupting behavior. Do not choose the fuse solely by matching it to the filter's current label.
2. Decide what the integrated fuse and switch must accomplish
A single-fuse configuration may be suitable only where the installation and applicable product-safety architecture permit protection in the designated ungrounded conductor. A double-fuse configuration can support other supply arrangements, but the final design must be reviewed against the target market, plug orientation, earthing system, and equipment standard. Likewise, a two-pole rocker switch provides a different isolation function from a single-pole switch. Define whether the switch is an operating control, a disconnecting means, or simply a convenience feature; those functions are not interchangeable.
3. Lock the panel interface and termination
Do not release a cabinet or product panel drawing from a catalog image. Select the exact case first, obtain the controlled drawing, and verify cutout tolerances, panel thickness, front- or rear-mount orientation, snap-in retention, screw access, fuse access, and rear wiring clearance. Check that quick-connect receptacles are compatible with the selected tab width and thickness and that assembly tools can reach the terminals. If a wire-lead version is required, add conductor length, gauge, insulation, color, stripping, ferrules or terminals, labeling, and pull requirements to the RFQ.
EMC, Safety, and Installation Considerations
An EMI filter is part of an EMC control strategy, not a stand-alone guarantee that equipment will pass emissions or immunity testing. Results depend on noise source impedance, load impedance, switching frequencies, cable routing, enclosure bonding, protective-earth quality, and physical separation between the unfiltered and filtered sides. The filter should normally be placed at the power-entry boundary so noise does not bypass it through long unfiltered conductors or capacitive coupling.
Keep line-side wiring short and physically separated from load-side wiring. Provide a low-impedance chassis/earth bond where the construction requires it, and avoid routing noisy power or motor conductors alongside sensitive control and communication wiring. Metal-panel contact, coating removal around the bonding interface, fastener control, and enclosure seams can materially affect high-frequency behavior. For teams integrating the part into a production cabinet, the build-to-print control-panel checkpoint system provides a useful framework for drawing, wiring, and inspection control.
The product literature shows multiple certification and environmental-compliance marks and states that relevant product certificates are available. Treat those marks as prompts for document review, not as blanket approval of every possible order code. Ask TPS to identify the exact model covered by each certificate, the certificate number and revision, rated conditions, permitted fuse, and any installation conditions. Medical, laboratory, audio, vending, and other regulated equipment still require system-level safety and EMC evaluation.
Application Fit
The YB-B Series is positioned for portable electrical and electronic equipment, small and medium-size machines, household equipment, test and measurement instruments, single-phase and switch-mode power supplies, audio equipment, vending machines, and medical equipment. In practical B2B projects, it is most attractive where the designer values a compact, serviceable, integrated AC entry more than the modular flexibility of separate inlet, switch, fuse holder, and filter components.
Examples include benchtop instruments, compact automation devices, standalone controllers, test fixtures, small industrial power units, and operator-accessible equipment. It may be less appropriate when current exceeds the series range, a different inlet system is mandatory, very high insertion loss is required at a troublesome frequency, leakage limits are unusually stringent, or the protection/disconnect architecture cannot be met by available configurations. For DIN-rail cabinet layouts where a separate filter is preferred, compare the selection logic in the YB-D+DIN single-phase EMI filter guide. For a panel-mounted alternative without an integrated inlet, the YB-F Series selection guide may help define the tradeoff.
Supplier and Project Evaluation
At BoFu stage, price and current rating are only the first screen. A supplier should be able to convert application inputs into a controlled part number, drawing, evidence package, sample plan, and repeatable production supply. TPS has product and solution capability in this category and can support model selection, equivalent-solution review, customization discussions, equipment integration, and engineering consultation for global B2B projects.
Ask whether the supplier can provide the exact outline drawing, terminal definition, schematic, fuse details, certificate mapping, material-compliance documents, and model-specific performance data before purchase order release. Confirm sample availability, engineering-sample versus production configuration, minimum order quantity, forecast expectations, lead time, packaging, change-notification process, lot traceability, and handling of deviations. If the project includes broader assembly, TPS can also coordinate capabilities described in its power-electronics manufacturing stack and custom cable and wire-harness services.
Build an RFQ That Can Be Quoted
Send the following information with your inquiry:
- Application, equipment type, target markets, and applicable equipment-level standards;
- Nominal and maximum input voltage, frequency, continuous current, inrush profile, duty cycle, and maximum internal ambient;
- Required fuse count, fuse size/type and rating, rocker-switch function and color, or no integrated switching;
- Preferred case family, mounting method, panel material/thickness, cutout drawing, rear-clearance limit, and annual design-life expectation;
- Output connection: 6.3 × 0.8 mm tab, 4.0 × 0.8 mm tab, or fully defined wire-lead specification;
- Conducted-emissions problem frequencies or target limits, leakage-current ceiling, grounding plan, and any existing pre-compliance data;
- Certificate and compliance documents required for the exact destination markets;
- Prototype quantity, production quantity, annual forecast, requested delivery date, ship-to country, and customization needs.
TPS can use this information to recommend a YB-B configuration or discuss an equivalent and customized solution. Review the YB-B Series specifications and quote options, then submit the application data rather than only asking for “a 10 A filter.” That gives sales and engineering enough context to verify fit, identify missing evidence, and return a more useful quotation.
FAQ
Is the YB-B Series only an IEC inlet?
No. It integrates a single-phase EMI filter with an IEC-style power-entry interface. Depending on the selected case and order code, the assembly can also include one or two fuses or a two-pole rocker switch.
Can I select a 10 A model for any load below 10 A?
Not automatically. Selection must account for RMS current, inrush, ambient temperature, terminal and fuse derating, duty cycle, and the exact approved configuration. Ask TPS to validate the operating profile before freezing the BOM.
Will installing a YB-B filter guarantee EMC compliance?
No component can guarantee system-level compliance by itself. Filter performance depends on installation, grounding, wiring separation, source/load impedances, and enclosure construction. Pre-compliance and final equipment testing remain necessary.
What documents should procurement request?
Request the controlled model-specific datasheet and outline drawing, schematic and terminal definition, attenuation and leakage data where applicable, certificate mapping, material-compliance declarations, sample identification, lead time, change-control terms, and traceability information.
Can TPS support a customized or integrated solution?
Yes. TPS can support selection, equivalent-solution review, customization discussions, integration, and engineering consultation for global B2B projects. Start with the YB-B Series product page and include the RFQ checklist above so the team can evaluate the project efficiently.
Ready to confirm the power-entry configuration?
Request a YB-B Series quote from TPS with your line conditions, fuse/switch preference, panel drawing, EMC target, quantity, and schedule. TPS will help turn those inputs into a technically reviewable configuration and project quotation.
